Design Build – WAARNG Barracks at Yakima Training Center

This is a complete Design Build Project for the Army Corp of Engineers Seattle Division to perform all Electrical, Telecomm/Data, and Fire for the new 128 person 3-story Barracks at the Yakima Training Facility. The Electrical covers the Site Work, bringing in power to the site, and all interior and exterior work.

Estimated Start and Completion Dates: 09/2018-07/2020

Prime: TDX Quality
Yakima Training Center

Skagit Horticulture New Construction

Design Build Project for a 225,000 square foot greenhouse. This project included the installation of new primary electrical service that required a utility upgrade on the primary service. We provided and installed lighting throughout the entire facility. Various controls and control panels were installed to control the buildings shade system, roll-up doors, vent motors, automatic watering system, temperature sensors and heating systems. We also provided the re-condition of the buildings boiler system.

Prime: Skagit Horticulture
Mount Vernon, WA

Boeing Steam Utility Upgrade

Multi Phase project that consisted of 3 years to complete. New construction steam line was installed underground to serve as an upgrade to the existing steam system.  New lighting, ventilation system, controls, and dewatering.  Worked with engineering on 40, 60, 100% design to final IFC for construction.

Power outages were required in multiple building to supply primary needs to tunnel. This required no disruption in client production of services.  Temporary lighting / power and was installed thru the building interior for continuation of steam system upgrade. Multiple of other projects were completed during the contract form trailer relocation, PIV valve commissioning and wiring, relocating and removing electrical for project continuation.

Prime: Greenberry
Everett, WA

Replace Motor Control Cabinet B385

This Design Build Project is to provide the replacement of the existing Motor Control Center located in the Air Traffic Control Center. The existing Motor Control cabinet is to be replaced to maintain the electrical equipment distribution for critical equipment supporting the mission of the facility. We provided new conduit and copper feeder cables from the switchboard to the new motor control equipment. We designed this project to provide and install a NEMA 4x Sub-Panel with combination motor starts. We provided the new feeder to the new sub-panel located on the rooftop near the existing MCC to include 3″ conduit and copper conductors.

Bayview provided the engineering, design and installation for this project.

Prime: WHH Nisqually Federal Services
Whidbey Naval Air Station

B243 Relocation Project

This project is a Design-Build Federal Project for the Relocation of occupants from multiple buildings at Whidbey NAS. This project included Electrical and Communication demo work of (3) buildings prior to starting construction of all new office spaces. We provided all new data ports and testing, relocation and new receptacles, relocation and new LED light fixtures, providing a new Car Charger station, new manual pull station for Fire Alarm, Power poles, Full Duress System and a Video Surveillance System.

Prime: Valdez Construction
Whidbey Naval Air Station

Playhouse Dental

New construction of a 3,500 sq. ft. dental facility in Anacortes, WA. This project consisted of providing design/build electrical, data/voice, fire alarm system, and custom lighting package. Bayview Electric worked hand in hand with the Prime Contractor to build a one of a kind childrens dentist office.

Prime: Aldrich & Associates
Anacortes, WA

Small Arms Training Facility Upgrade

Design Build Project to upgrade, provide new and replace existing Lighting to LED and meet all applicable UFC codes. Design, provide and install all new LED Lighting outside on the range with new controls to be able to switch by target row. Provide and install new hearing system for the shooters and instructors. Changeover of electrical service provide new service and installation of new panel.

Prime: Valdez Construction
Whidbey Naval Air Station

ICS – SCADA System

Design and install a new SCADA system compliant with NAVFAC NW ICS Design Guide. Replace and Water Data Acquisition technology employed at Naval Air Station Whidbey. This included all Electrical, Fiber Optics, and trenching design and installation.

Prime: Rore Inc.
Whidbey Naval Air Station

P-257 Hangar 11 Modification

Provide Design and construction services for Electrical, Telecommunications, and Fire Alarm & Detection to ensure deliver of a fully functional system.

Prime: Rore Inc.