Full service electrical contractor

Bayview Projects

Manufacturing

Back

Boeing West Railyard Expansion & E6 Parking Lot

Construct a new 3 phase 480V, 208V / 120V service rack that provided primary power expansion of the west railyard expansion.  Add additional perimeter area lighting for expansion for both E6 and West Railyard Expansion.

Prime: Interwest Construction
Everett, WA

Boeing Steam Utility Upgrade

Multi Phase project that consisted of 3 years to complete. New construction steam line was installed underground to serve as an upgrade to the existing steam system.  New lighting, ventilation system, controls, and dewatering.  Worked with engineering on 40, 60, 100% design to final IFC for construction.

Power outages were required in multiple building to supply primary needs to tunnel. This required no disruption in client production of services.  Temporary lighting / power and was installed thru the building interior for continuation of steam system upgrade. Multiple of other projects were completed during the contract form trailer relocation, PIV valve commissioning and wiring, relocating and removing electrical for project continuation.

Prime: Greenberry
Everett, WA

Alcoa – Repair Interior & Exterior Lighting

Repair, trouble shoot and replace existing lighting in potline buildings. Numerous corrections of failing electrical components due to building life.  Safety was amongst top priority since some potline remained active with 50,000V potential.

 

Prime: Alcoa
Ferndale, WA

Alcoa – Substation B Ground Grid Upgrade

Replace Primary Grid using 5/8” steel cable and installation of ground wells, anodes, ground rods and ground mats.  Taps were exothermic welded to make final connections. Bayview managed a subcontractor for  the excavation work which entailed the use of a vacuum truck to remove and replace the substation rock and create trenches due to the high voltage potential in substation area.   Final testing was completed using a meggar GTS-300

Prime: Alcoa
Ferndale, WA