Install MP5000 Barrier

Provide all labor and equipment necessary for a complete installation of the barrier system at the Main Gate. Provide power for Barrier from panel and replace panel. Field verify panel for capacity and voltage to install new circuits for Barrier. Provide and install 2 denial barrier controllers at gate. Provide and install new conduit from overhead to a position on pole facing building in a position sufficient to promote rapid deployment of the barriers.

Prime: Valdez Construction
Naval Radio Station Jim Creek